Stuttgart 21 – Concrete base Filder tunnel
Facts and Figures
Company | ÖBA – Österreichische Betondecken Ausbau GmbH |
Principal | Consortium ATCOST 21 |
Location | Stuttgart - Germany |
Type | Special concrete construction |
Runtime | 01.2016 - 04.2016 |
High tech underground.
On the major construction site of Stuttgart 21, ÖBA manufactured a concrete tunnel slab with a durable water trough and a cross section of 5.5 m.
The approximately 4.0 km long stretch with a cross section of approximately 4.0 m³/running metre was realised with an average performance of 150 running metres/day.
This enormous achievement was made possible by a slip-form paver. It moves along the segment with a track system angled at 40°.
Technical equipment and experience were significant criteria for the customer in assigning this major project to ÖBA.