Skip to content

Suchergebnisse

Filter Site

165 results

1. Asphalt and concrete production

- Reference Vienna, AustriaRepair of the Gutheil Schoder Bridge Repair of the Gutheil Schoder Bridge Reference Vienna, Austria General overhaul of runway system 11/29 General overhaul of runway system…

2. Slab Track Austria

- Reference Chorherrn, AustriaSlab tracks Wienerwald Tunnel Slab tracks Wienerwald Tunnel Reference Vienna, AustriaLainz Tunnel Lainz Tunnel Reference St. Anton/Langen, AustriaArlberg railway tunnel…

3. Demolition, deconstruction & urban mining

- Environmental engineering MD PORR Umwelttechnik GmbHMartin Kahrer Martin Kahrer ENVIRONMENTAL ENGINEERING MD PORR Umwelttechnik GmbHAndreas Vock Andreas Vock Reference Vienna, AustriaDemolition of…

4. Structural engineering

- REFERENCE Vorarlberg, AustriaSchmiedtobel viaduct Schmiedtobel viaduct REFERENCE Vienna, AustriaMarina Deck Marina Deck REFERENCE Landeck, AustriaLandeck Inn River Bridge Landeck Inn River…

5. Road construction

- REFERENCE Wieselburg, AustriaNew B25 bypass New B25 bypass REFERENCE Klösterle, AustriaRerouting of L 197 Arlberg pass road Rerouting of L 197 Arlberg pass road REFERENCE Vienna, AustriaPrater…

6. Industrial construction and special buildings

- Reference St. Pölten, ViennaSt. Pölten Car Park St. Pölten Car Park Reference Bad St. Leonhard, ViennaThe KLH Wiesenau plant The KLH Wiesenau plant Reference Baumgarten,…

7. Steel construction – everything from a single source

- Vienna Certificate EN 1090-1 Certificate EN 1090-1 Reference Gleisdorf, AustriaRaab Bridge in Gleisdorf Raab Bridge in Gleisdorf Steel Construction Austria Commercial Branch ManagerErnst Strobl Ernst…

8. PORR Austria - State-of-the-art construction

- Video Intelligent building connects people. Intelligent building connects people. We are and will remain a construction company – offering everything from a single source. From design to…
Presse

9. PORR delivers top results in 2023

- Improvements at every level, positive outlook for 2024 Production output up by 5.6% to EUR 6.6 bn Top order backlog of EUR 8.5 bn – a rise of 3.0% Increase in EBT by 18.8% to EUR 130.7m EBIT…

10. Large-scale equipment

- Tamping Perfectly positioned. Perfectly positioned. Screwing Optimal mounting. Optimal mounting. Milling Modern treatment. Modern treatment. Laying tracks The best-laid tracks. The best-laid…
Search results 1 until 10 of 165