Sealing Wienerwald Tunnel
Company | IAT GmbH |
Principal | ARGE Tunnel Wienerwald |
Location | Vienna - Austria |
Type | Waterproofing |
Runtime | 08.2006 - 12.2009 |
Perfectly isolated.
While expanding the west track section, the new Wienerwald Tunnel arose between the city border of Vienna and Lower Austria. The approximately 13.35 km railway tunnel runs from Hadersdorf-Weidlingau in the east to Chorherrn in the west. IAT GmbH, a 100% subsidiary of the PORR Group, is responsible for the sealing work in this project as part of a consortium. The laying of the sealant is coordinated with the excavation methods: The east excavation from Hadersdorf-Weidlingau is performed using the usual explosives. Here, fleece and the PVC sealing strips are manually applied for sealing from a truss, a conventional sealing. For the west excavation from Chorherrn, tunnel boring machines milled two tunnel pipes with 11 km length apiece, which were then expanded with segments. In this section, the sealing was done using a hotmelt adhesive, with which the fleece-lined sealing strips were bonded hot to the underground using special, fully automatic laying machines.
The Wienerwald Tunnel is one of the first construction projects in Austria in which this innovative sealing system was used. The original development comes from Switzerland, which is known for a high degree of mechanisation in tunnel construction. The experiences gained as part of this project create an advance in knowledge and make the innovative subsidiary of the PORR Group an important partner for future construction projects in this sector.